Spartanburg, SC interconnection queue

3 active projects totaling 155.5 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

3active projects
155.5active MW
10total filed
Queue IDProjectkVMWResourceStatus
977574 Not reported n/r 709.9 Gas Withdrawn
900491 Not reported n/r 100 Battery Withdrawn
977308 Not reported 230 99 Battery Active
569804 Not reported 100 54 Solar Active
974794 Not reported n/r 48 Gas Withdrawn
126048 Not reported n/r 25 Solar Withdrawn
958048 Not reported 100 10 Solar Withdrawn
952090 Not reported n/r 6.6 Solar Withdrawn
958038 Not reported 100 5 Solar Withdrawn
966893 Not reported n/r 2.5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.