Spartanburg, SC interconnection queue
3 active projects totaling 155.5 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).
3active projects
155.5active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 977574 | Not reported | n/r | 709.9 | Gas | Withdrawn |
| 900491 | Not reported | n/r | 100 | Battery | Withdrawn |
| 977308 | Not reported | 230 | 99 | Battery | Active |
| 569804 | Not reported | 100 | 54 | Solar | Active |
| 974794 | Not reported | n/r | 48 | Gas | Withdrawn |
| 126048 | Not reported | n/r | 25 | Solar | Withdrawn |
| 958048 | Not reported | 100 | 10 | Solar | Withdrawn |
| 952090 | Not reported | n/r | 6.6 | Solar | Withdrawn |
| 958038 | Not reported | 100 | 5 | Solar | Withdrawn |
| 966893 | Not reported | n/r | 2.5 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.