Duke Energy queue ID 567168

Queue request 567168 was listed in the Duke Energy interconnection queue at the end of 2025 as a 197 MW battery project in Mecklenburg County, NC, according to Berkeley Lab’s queue data file. The filing names HARRISBURG TIE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 17, 2029.

Queue ID567168
Project nameNot reported
Status (as published)Active
SubstationHARRISBURG TIE
Point of interconnectionHARRISBURG TIE 230 kV
CountyMecklenburg
StateNC
Voltage230 kV
Capacity197 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-12-17
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mecklenburg, NC: 5 requests in the Duke Energy queue, 4 active totaling 274.1 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2022 DISIS
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Engineering Design
Queue date2022-06-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.