Duke Energy request 567168
Duke Energy queue ID 567168
Queue request 567168 was listed in the Duke Energy interconnection queue at the end of 2025 as a 197 MW battery project in Mecklenburg County, NC, according to Berkeley Lab’s queue data file. The filing names HARRISBURG TIE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 17, 2029.
| Queue ID | 567168 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | HARRISBURG TIE |
| Point of interconnection | HARRISBURG TIE 230 kV |
| County | Mecklenburg |
| State | NC |
| Voltage | 230 kV |
| Capacity | 197 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2029-12-17 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Mecklenburg, NC: 5 requests in the Duke Energy queue, 4 active totaling 274.1 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | 2022 DISIS |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Engineering Design |
| Queue date | 2022-06-28 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.