Mecklenburg, NC interconnection queue

4 active projects totaling 274.1 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

4active projects
274.1active MW
5total filed
Queue IDProjectkVMWResourceStatus
567168 Not reported 230 197 Battery Active
957247 Not reported 500 40 Nuclear Active
957243 Not reported n/r 33 Nuclear Active
976447 Not reported n/r 4.1 Battery Active
41456 Not reported n/r 2.8 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.