Duke Energy request 4904

Duke Energy queue ID 4904

Queue request 4904 was listed in the Duke Energy interconnection queue at the end of 2025 as a 23 MW solar project in Bladen County, NC, according to Berkeley Lab’s queue data file. The filing names Fayetteville DuPont as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue ID4904
Project nameNot reported
Status (as published)Operational
SubstationFayetteville DuPont
Point of interconnectionFayetteville DuPont 115Kv
CountyBladen
StateNC
Voltage115 kV
Capacity23 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bladen, NC: 14 requests in the Duke Energy queue, 2 active totaling 103 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperTangent Energy Solutions, INC.
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Commercial Operation - Commercial Operation Date Declared
Queue date2012-08-20
Operational date2015-12-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.