Substation Scout

Bladen, NC interconnection queue

2 active projects totaling 103 MW in the Duke Energy queue, plus 12 with terminal status (shown grayed).

2active projects
103active MW
14total filed
Queue IDProjectkVMWResourceStatus
66832 Not reported 230 450 Solar Withdrawn
169716 Not reported 230 80 Solar Withdrawn
32986 Not reported 230 80 Solar Withdrawn
564034 Not reported 230 80 Solar Withdrawn
564510 Not reported 230 80 Solar Active
566240 Not reported 230 80 Solar Withdrawn
890857 Not reported 230 80 Solar Withdrawn
920641 Not reported n/r 80 Solar Withdrawn
977268 Not reported n/r 80 Solar Withdrawn
961752 Not reported 230 79.9 Solar Withdrawn
17508 Not reported 230 60 Solar Withdrawn
915755 Not reported n/r 50 Solar Withdrawn
4904 Not reported 115 23 Solar Operational
899257 Not reported n/r 1 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first