Substation Scout

Duke Energy request 343

Duke Energy queue ID 343

Queue request 343 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Orange County, FL, according to Berkeley Lab’s queue data file. The filing names Sweetwater Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue ID343
Project nameNot reported
Status (as published)Active
SubstationSweetwater Switching Station
Point of interconnectionSweetwater Switching Station
CountyOrange
StateFL
VoltageNot reported
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sweetwater Switching Station substation: 3 requests in the Duke Energy queue, 3 active totaling 224.7 MW.

Queue IDProjectMWResourceStatus
341Not reported74.9SolarActive
342Not reported74.9SolarActive

Orange, FL: 5 requests in the Duke Energy queue, 4 active totaling 236.7 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
ClusterCluster: Transitional Cluster Study; Cluster Sub Group: Not Designated
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Queue date2024-01-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.