Orange, FL interconnection queue

4 active projects totaling 236.7 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

4active projects
236.7active MW
5total filed
Queue IDProjectkVMWResourceStatus
341 Not reported n/r 74.9 Solar Active
342 Not reported n/r 74.9 Solar Active
343 Not reported n/r 74.9 Solar Active
107 Not reported n/r 36 Other Withdrawn
FC100379 Not reported 69 12 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.