Substation Scout

Duke Energy request 243

Duke Energy queue ID 243

Queue request 243 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Hardee County, FL, according to Berkeley Lab’s queue data file. The filing names Fort Green Springs Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 6, 2022.

Queue ID243
Project nameNot reported
Status (as published)Operational
SubstationFort Green Springs Substation
Point of interconnectionFort Green Springs Substation
CountyHardee
StateFL
VoltageNot reported
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2022-06-06
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hardee, FL: 11 requests in the Duke Energy queue, 2 active totaling 149.8 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2018-11-15
Operational date2022-04-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first