Substation Scout

Hardee, FL interconnection queue

2 active projects totaling 149.8 MW in the Duke Energy queue, plus 9 with terminal status (shown grayed).

2active projects
149.8active MW
11total filed
Queue IDProjectkVMWResourceStatus
89 Not reported n/r 966 Gas Withdrawn
76 Not reported n/r 566 Gas Withdrawn
7 Not reported 230 525 Gas Withdrawn
150 Not reported n/r 74.9 Solar Withdrawn
243 Not reported n/r 74.9 Solar Operational
253 Not reported n/r 74.9 Solar Operational
229 Not reported n/r 74.5 Solar Withdrawn
230 Not reported n/r 74.5 Solar Withdrawn
263 Not reported n/r 74.5 Solar Withdrawn
264 Not reported n/r 74.5 Solar Withdrawn
115 Not reported n/r 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first