Duke Energy request 242

Duke Energy queue ID 242

Queue request 242 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Hernando County, FL, according to Berkeley Lab’s queue data file. The filing names Nobleton Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2022.

Queue ID242
Project nameNot reported
Status (as published)Operational
SubstationNobleton Substation
Point of interconnectionNobleton Substation
CountyHernando
StateFL
VoltageNot reported
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2022-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hernando, FL: 8 requests in the Duke Energy queue, 3 active totaling 224.7 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2018-11-14
Operational date2022-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.