Home / Duke Energy / Counties / Hernando, FL
Hernando, FL interconnection queue
3 active projects
totaling 224.7 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).
3 active projects
224.7 active MW
8 total filed
Queue ID Project kV MW Resource Status
92
Not reported
n/r
1,263
Gas
Withdrawn
106
Not reported
n/r
450
Gas
Withdrawn
25
Not reported
n/r
133
Coal
Withdrawn
187
Not reported
n/r
74.9
Solar
Withdrawn
242
Not reported
n/r
74.9
Solar
Operational
319
Not reported
n/r
74.9
Solar
Suspended
320
Not reported
n/r
74.9
Solar
Suspended
97
Not reported
n/r
17
Coal
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.