Hernando, FL interconnection queue

3 active projects totaling 224.7 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

3active projects
224.7active MW
8total filed
Queue IDProjectkVMWResourceStatus
92 Not reported n/r 1,263 Gas Withdrawn
106 Not reported n/r 450 Gas Withdrawn
25 Not reported n/r 133 Coal Withdrawn
187 Not reported n/r 74.9 Solar Withdrawn
242 Not reported n/r 74.9 Solar Operational
319 Not reported n/r 74.9 Solar Suspended
320 Not reported n/r 74.9 Solar Suspended
97 Not reported n/r 17 Coal Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.