Duke Energy request 196564

Duke Energy queue ID 196564

Queue request 196564 was listed in the Duke Energy interconnection queue at the end of 2025 as a 80 MW solar project in Davidson County, NC, according to Berkeley Lab’s queue data file. The filing names High Point White (BURL IND BURL KNIT FAB DIV as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID196564
Project nameNot reported
Status (as published)Active
SubstationHigh Point White (BURL IND BURL KNIT FAB DIV
Point of interconnectionHigh Point White 100kV (BURL IND BURL KNIT FAB DIV
CountyDavidson
StateNC
Voltage100 kV
Capacity80 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Davidson, NC: 8 requests in the Duke Energy queue, 2 active totaling 1,474.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2022 DEC RSC
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - In Progress
Queue date2022-01-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.