Substation Scout

Davidson, NC interconnection queue

2 active projects totaling 1,474.9 MW in the Duke Energy queue, plus 6 with terminal status (shown grayed).

2active projects
1,474.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
73054 Not reported 230 1,503 Gas Withdrawn
977731 Not reported 230 1,394.9 Gas Active
567758 Not reported 230 500 Gas Withdrawn
196564 Not reported 100 80 Solar Active
569072 Not reported 100 80 Solar Withdrawn
126060 Not reported n/r 60 Solar Withdrawn
920657 Not reported n/r 28.8 Solar Withdrawn
963469 Not reported 100 28.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.