Queue request 186466 was listed in the Duke Energy interconnection queue at the end of 2025 as a 50 MW battery project in Gaston County, NC, according to Berkeley Lab’s queue data file. The filing names Allen BL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2025.
| Queue ID | 186466 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Allen BL |
| Point of interconnection | Allen BL 100kV |
| County | Gaston |
| State | NC |
| Voltage | 100 kV |
| Capacity | 50 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2025-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Gaston, NC: 7 requests in the Duke Energy queue, 5 active totaling 813 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | Transitional Cluster Study |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Construction - In Progress |
| Queue date | 2021-07-06 |