Gaston, NC interconnection queue

5 active projects totaling 813 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

5active projects
813active MW
7total filed
Queue IDProjectkVMWResourceStatus
138414 Not reported 230 348 Gas Withdrawn
977301 Not reported 230 250 Battery Active
898881 Not reported n/r 199.9 Battery Withdrawn
956141 Not reported 100 199 Battery Active
977299 Not reported 100 199 Battery Active
563648 Not reported n/r 115 Battery Active
186466 Not reported 100 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.