Substation Scout

Duke Energy request 164382

Duke Energy queue ID 164382

Queue request 164382 was listed in the Duke Energy interconnection queue at the end of 2025 as a 37.5 MW solar project in Laurens County, SC, according to Berkeley Lab’s queue data file. The filing names Clinton WH as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2026.

Queue ID164382
Project nameNot reported
Status (as published)Active
SubstationClinton WH
Point of interconnectionClinton WH 100kV
CountyLaurens
StateSC
Voltage100 kV
Capacity37.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Laurens, SC: 9 requests in the Duke Energy queue, 2 active totaling 87.5 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
ClusterTransitional Cluster Study
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - In Progress
Queue date2020-03-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first