Laurens, SC interconnection queue

2 active projects totaling 87.5 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

2active projects
87.5active MW
9total filed
Queue IDProjectkVMWResourceStatus
918639 Not reported n/r 74.9 Solar Withdrawn
962982 Not reported 100 60 Solar Withdrawn
63666 Not reported n/r 55 Solar Withdrawn
564376 Not reported 100 50 Solar Withdrawn
963122 Not reported 100 50 Solar Active
126078 Not reported n/r 40 Solar Withdrawn
164382 Not reported 100 37.5 Solar Active
165980 Not reported 100 37.5 Solar Withdrawn
957065 Not reported 44 18 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.