York, SC interconnection queue

2 active projects totaling 139 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2active projects
139active MW
4total filed
Queue IDProjectkVMWResourceStatus
977302 Not reported 100 99 Battery Active
126022 Not reported n/r 47 Solar Withdrawn
220734 Not reported 100 47 Solar Withdrawn
957233 Not reported 230 40 Nuclear Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.