Substation Scout

Union, SC interconnection queue

1 active project totaling 75 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

1active projects
75active MW
8total filed
Queue IDProjectkVMWResourceStatus
920665 Not reported n/r 75 Solar Active
920179 Not reported n/r 74.9 Solar Withdrawn
962858 Not reported 100 74.9 Solar Withdrawn
23506 Not reported n/r 74 Solar Withdrawn
977273 Not reported 100 63 Solar Withdrawn
126036 Not reported n/r 58 Solar Withdrawn
568024 Not reported 100 58 Solar Withdrawn
924437 Not reported n/r 58 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.