Richmond, NC interconnection queue

13 active projects totaling 1,106.6 MW in the Duke Energy queue, plus 9 with terminal status (shown grayed).

13active projects
1,106.6active MW
22total filed
Queue IDProjectkVMWResourceStatus
170274 Not reported 230 275 Solar Withdrawn
569986 Not reported 230 275 Solar Withdrawn
923973 Not reported 230 275 Solar Active
PP00046 Not reported n/r 275 Other Active
977773 Not reported 230 260 Gas Active
909227 Not reported n/r 80 Solar Withdrawn
568778 Not reported 230 65 Solar Withdrawn
200482 Not reported 230 60 Solar Withdrawn
898595 Not reported 230 60 Solar Withdrawn
PP00013 Not reported n/r 46.8 Gas Active
899591 Not reported 230 46.8 Gas Active
610944 Not reported n/r 46.5 Solar Withdrawn
916613 Not reported 230 46.5 Solar Withdrawn
957700 Not reported 230 35 Gas Active
PP00014 Not reported n/r 35 Gas Active
25667 Not reported 230 32 Gas Operational
64646 Not reported 230 22 Gas Operational
64750 Not reported 230 21 Gas Operational
64734 Not reported 230 20 Gas Operational
64758 Not reported 230 20 Gas Operational
63790 Not reported 230 18 Gas Operational
958350 Not reported 115 8.2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.