Substation Scout

Lincoln, NC interconnection queue

1 active project totaling 40 MW in the Duke Energy queue.

1active projects
40active MW
1total filed
Queue IDProjectkVMWResourceStatus
919551 Not reported n/r 40 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first