100MW Midway-Bonneville
BPA queue ID G67 Terminal status
| Queue ID | G67 |
|---|---|
| Project name | 100MW Midway-Bonneville |
| Status (as published) | WITHDRAWN |
| Substation | Midway-Bonneville line near Goldendale WA |
| Point of interconnection | Midway-Bonneville 230 kV line near Goldendale WA |
| County | Klickitat |
| State | OR |
| Voltage | 230 kV |
| Capacity | 100 MW |
| Resource (as published) | Wind Turbine/Wind Turbine |
| Resource category | Wind (normalised for filtering) |
| Target commercial operation | 2003-09-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Requestor | ABB Equity Ventures Inc |
|---|---|
| Connection Type | GI |
| Interconnection Type | Energy |
| Poi | Midway-Bonneville 230 kV line near Goldendale WA |
| Generator Type | Wind Turbine |
| Fuel Source | Wind Turbine |
| Nameplate Mw Total | 100 |
| Max Summer Mw | 100 |
| Max Winter Mw | 100 |
| Reason Not Completed | . |
| Comments | Withdrawn by Customer |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.