Summit/Westward
BPA queue ID G128 Terminal status
| Queue ID | G128 |
|---|---|
| Project name | Summit/Westward |
| Status (as published) | WITHDRAWN |
| Substation | BPA’s Driscoll switchyard |
| Point of interconnection | BPA’s Driscoll 230kV switchyard |
| County | Clatsop |
| State | OR |
| Voltage | 230 kV |
| Capacity | 536 MW |
| Resource (as published) | Natural Gas/Gas Turbine |
| Resource category | Gas (normalised for filtering) |
| Target commercial operation | 2009-03-10 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Requestor | Summit Power Northwest Project, LLC |
|---|---|
| Connection Type | GI |
| Interconnection Type | Energy |
| Poi | BPA’s Driscoll 230kV switchyard |
| Generator Type | Gas Turbine |
| Fuel Source | Natural Gas |
| Nameplate Mw Total | 536 |
| Max Summer Mw | 536 |
| Max Winter Mw | 536 |
| Reason Not Completed | . |
| Comments | March 11, 2010: This is provisionally posted as 'Withdrawn' pending confirmation that OR EFSC has terminated the site certificate. |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.