Substation Scout

Summit/Westward

BPA queue ID G128 Terminal status

Queue IDG128
Project nameSummit/Westward
Status (as published)WITHDRAWN
SubstationBPA’s Driscoll switchyard
Point of interconnectionBPA’s Driscoll 230kV switchyard
CountyClatsop
StateOR
Voltage230 kV
Capacity536 MW
Resource (as published)Natural Gas/Gas Turbine
Resource categoryGas (normalised for filtering)
Target commercial operation2009-03-10
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

RequestorSummit Power Northwest Project, LLC
Connection TypeGI
Interconnection TypeEnergy
PoiBPA’s Driscoll 230kV switchyard
Generator TypeGas Turbine
Fuel SourceNatural Gas
Nameplate Mw Total536
Max Summer Mw536
Max Winter Mw536
Reason Not Completed.
CommentsMarch 11, 2010: This is provisionally posted as 'Withdrawn' pending confirmation that OR EFSC has terminated the site certificate.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.