Not reported
BPA queue ID G1070 Terminal status
| Queue ID | G1070 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | Tucannon River: Puget Sound Energ Feeder 1 |
| Point of interconnection | Tucannon River: Puget Sound Energ 115kV Feeder 1 |
| County | Columbia |
| State | WA |
| Voltage | 115 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-08-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | ERIS |
| Poi | Tucannon River: Puget Sound Energ 115kV Feeder 1 |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 219.5 |
| Max Summer Mw | 0 |
| Max Winter Mw | 0 |
| Reason Not Completed | . |
| Comments | Combined output not to exceed 157 MW |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.