Not reported

BPA queue ID G1065 Terminal status

Queue IDG1065
Project nameNot reported
Status (as published)WITHDRAWN
SubstationBPA FEEDER: ALBANY L184, FEEDER to NETL BYPASS DISCONNECT (POLE SWITCH). INTERCONNECTION TO OCCUR ON THE NETL SIDE OF THE BYPASS DISCONNECT
Point of interconnectionBPA FEEDER: ALBANY L184, 12kV FEEDER to NETL BYPASS DISCONNECT (POLE SWITCH). INTERCONNECTION TO OCCUR ON THE NETL SIDE OF THE BYPASS DISCONNECT
CountyLinn
StateOR
Voltage12 kV
Capacity1 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2025-09-30
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiBPA FEEDER: ALBANY L184, 12kV FEEDER to NETL BYPASS DISCONNECT (POLE SWITCH). INTERCONNECTION TO OCCUR ON THE NETL SIDE OF THE BYPASS DISCONNECT
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total1
Max Summer Mw1
Max Winter Mw1
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.