BPA queue ID G1064 Terminal status

Queue IDG1064
Project nameNot reported
Status (as published)WITHDRAWN
SubstationUEC Westland to McNary line that terminates in the Bay 16 terminal of the McNary Substation.
Point of interconnectionUEC Westland to McNary 230 kV line that terminates in the 230 kV Bay 16 terminal of the McNary Substation.
CountyUmatilla
StateOR
Voltage230 kV
Capacity15 MW
Resource (as published)Battery/Energy Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2026-01-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiUEC Westland to McNary 230 kV line that terminates in the 230 kV Bay 16 terminal of the McNary Substation.
Generator TypeEnergy Storage
Fuel SourceBattery
Nameplate Mw Total15
Max Summer Mw15
Max Winter Mw15
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.