Not reported

BPA queue ID G1051 Terminal status

Queue IDG1051
Project nameNot reported
Status (as published)WITHDRAWN
SubstationLa Pine Substation at
Point of interconnectionLa Pine Substation at 230 kV
CountyDeschutes
StateOR
Voltage230 kV
Capacity1,300 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2030-12-02
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS & ERIS
PoiLa Pine Substation at 230 kV
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total2658
Max Summer Mw1300
Max Winter Mw1300
ClusterTransition Cluster
Reason Not Completed.
CommentsGrid-Charged BESS

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.