BPA queue ID G1009 Terminal status
| Queue ID | G1009 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | Alfalfa Substation at |
| Point of interconnection | Alfalfa Substation at 230kV |
| County | Yakima |
| State | WA |
| Voltage | 230 kV |
| Capacity | 600 MW |
| Resource (as published) | Pumped-Storage Hydro/Energy Storage |
| Resource category | Hydro (normalised for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | Alfalfa Substation at 230kV |
| Generator Type | Energy Storage |
| Fuel Source | Pumped-Storage Hydro |
| Nameplate Mw Total | 600 |
| Max Summer Mw | 600 |
| Max Winter Mw | 600 |
| Cluster | Transition Cluster |
| Reason Not Completed | . |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.