Substation Scout

Not reported

BPA queue ID G0976 Terminal status

Queue IDG0976
Project nameNot reported
Status (as published)WITHDRAWN
SubstationLexington
Point of interconnectionLexington 115kV
CountyCowlitz
StateWA
Voltage115 kV
Capacity9 MW
Resource (as published)Biofuel/Reciprocating Engine
Resource categoryOther (normalised for filtering)
Target commercial operation2024-12-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS & ERIS
PoiLexington 115kV
Generator TypeReciprocating Engine
Fuel SourceBiofuel
Nameplate Mw Total8.8
Max Summer Mw9
Max Winter Mw9
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.