Not reported

BPA queue ID G0921 Terminal status

Queue IDG0921
Project nameNot reported
Status (as published)WITHDRAWN
SubstationChehalis - Covington No 1 line.
Point of interconnectionChehalis - Covington No 1 230kV line.
CountyThurston
StateWA
Voltage230 kV
Capacity300 MW
Resource (as published)Wind Turbine/Wind Turbine
Resource categoryWind (normalised for filtering)
Target commercial operation2030-10-30
Source datasetbpa-generation

Tracked changes

1 change observed between weekly snapshots of the BPA queue since BPA tracking began on September 22, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 300 STUDY → WITHDRAWN

Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS & ERIS
PoiChehalis - Covington No 1 230kV line.
Generator TypeWind Turbine
Fuel SourceWind Turbine
Nameplate Mw Total718
Max Summer Mw300
Max Winter Mw300
ClusterTransition Cluster
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.