Not reported
BPA queue ID G0855 Terminal status
| Queue ID | G0855 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | Lower Monumental-McNary No 1 line through a direct connection to a new substation |
| Point of interconnection | Lower Monumental-McNary No 1 500 kV line through a direct connection to a new 500 kV substation |
| County | Umatilla |
| State | OR |
| Voltage | 500 kV |
| Capacity | 450 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-12-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | Lower Monumental-McNary No 1 500 kV line through a direct connection to a new 500 kV substation |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 450 |
| Max Summer Mw | 450 |
| Max Winter Mw | 450 |
| Cluster | Transition Cluster |
| Reason Not Completed | . |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.