Not reported
BPA queue ID G0852 Terminal status
| Queue ID | G0852 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | 1) 16 miles south of Marion - Buckley line 2) 16 miles south of Ashe - Marion line 3) 5.61 miles south of Jones Canyon - Santiam line Note that it is proposed to build a double circuit line for all 3 POIs to loop into cust sub.. |
| Point of interconnection | 1) 16 miles south of Marion - Buckley 500kV line 2) 16 miles south of Ashe - Marion 500kV line 3) 5.61 miles south of Jones Canyon - Santiam 230kV line Note that it is proposed to build a double circuit 500kV line for all 3 POIs to loop into cust sub.. |
| County | Wasco |
| State | OR |
| Voltage | 500 kV |
| Capacity | 750 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-12-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | 1) 16 miles south of Marion - Buckley 500kV line 2) 16 miles south of Ashe - Marion 500kV line 3) 5.61 miles south of Jones Canyon - Santiam 230kV line Note that it is proposed to build a double circuit 500kV line for all 3 POIs to loop into cust sub.. |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 1500 |
| Max Summer Mw | 750 |
| Max Winter Mw | 750 |
| Cluster | Transition Cluster |
| Reason Not Completed | . |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.