BPA queue ID G0746 Terminal status

Queue IDG0746
Project nameNot reported
Status (as published)WITHDRAWN
SubstationPrimary POI: Franklin - Hedges No 1 line. Secondary POI: McNary-Berrian No 1 tap to McNary-Badger Canyon No 1 line
Point of interconnectionPrimary POI: Franklin - Hedges No 1 115 kV line. Secondary POI: McNary-Berrian No 1 tap to McNary-Badger Canyon No 1 115 kV line
CountyBenton
StateWA
Voltage115 kV
Capacity75 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2025-12-31
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS & ERIS
PoiPrimary POI: Franklin - Hedges No 1 115 kV line. Secondary POI: McNary-Berrian No 1 tap to McNary-Badger Canyon No 1 115 kV line
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total150
Max Summer Mw75
Max Winter Mw75
ClusterTransition Late Stage
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.