Not reported
BPA queue ID G0744 Terminal status
| Queue ID | G0744 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | 1. Vantage-Hanford #1 line 2. Corridor of the Midway- Rocky Ford and Midway-Potholes transmission lines |
| Point of interconnection | 1. Vantage-Hanford #1 500 kV line 2. Corridor of the 230kV Midway- Rocky Ford and Midway-Potholes 230kV transmission lines |
| County | Grant |
| State | WA |
| Voltage | 500 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2026-12-30 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | 1. Vantage-Hanford #1 500 kV line 2. Corridor of the 230kV Midway- Rocky Ford and Midway-Potholes 230kV transmission lines |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 208.9 |
| Max Summer Mw | 100 |
| Max Winter Mw | 100 |
| Cluster | Transition Cluster |
| Reason Not Completed | . |
| Comments | 100 MW grid charging |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.