Not reported
BPA queue ID G0680 Terminal status
| Queue ID | G0680 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | Sickler Substation |
| Point of interconnection | Sickler Substation |
| County | Adams |
| State | WA |
| Voltage | Not reported |
| Capacity | 300 MW |
| Resource (as published) | Battery/Energy Storage |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2023-08-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | ERIS |
| Poi | Sickler Substation |
| Generator Type | Energy Storage |
| Fuel Source | Battery |
| Nameplate Mw Total | 300 |
| Max Summer Mw | 300 |
| Max Winter Mw | 300 |
| Cluster | Transition Late Stage |
| Reason Not Completed | . |
| Comments | Co-located with a 200 MW solar project. |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.