BPA queue ID G0665 Terminal status
| Queue ID | G0665 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | Lower Granite or Central Ferry or Central Ferry |
| Point of interconnection | Lower Granite 500kV or Central Ferry 500kV or Central Ferry 230kV |
| County | Garfield |
| State | WA |
| Voltage | 500 kV |
| Capacity | 750 MW |
| Resource (as published) | Wind Turbine/Wind Turbine |
| Resource category | Wind (normalised for filtering) |
| Target commercial operation | 2025-12-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | Lower Granite 500kV or Central Ferry 500kV or Central Ferry 230kV |
| Generator Type | Wind Turbine |
| Fuel Source | Wind Turbine |
| Nameplate Mw Total | 1125 |
| Max Summer Mw | 750 |
| Max Winter Mw | 750 |
| Cluster | Transition Late Stage |
| Reason Not Completed | . |
| Comments | Wind 600 MW / Solar 150 MW / 375 MW Battery |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.