BPA queue ID G0653 Terminal status

Queue IDG0653
Project nameNot reported
Status (as published)WITHDRAWN
SubstationA new interconnection point onto BPA's existing Allston - Clatsop transmission line at BPA pole #-23-1 or a new interconnection point onto BPA's existing system at BPA's Driscoll substation.
Point of interconnectionA new 230 kV interconnection point onto BPA's existing 230 kV Allston - Clatsop transmission line at BPA pole #7102-23-1 or a new 230 kV interconnection point onto BPA's existing 230 kV system at BPA's Driscoll substation.
CountyClatsop
StateOR
Voltage230 kV
Capacity117 MW
Resource (as published)Wind Turbine/Wind Turbine
Resource categoryWind (normalised for filtering)
Target commercial operation2024-12-31
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS & ERIS
PoiA new 230 kV interconnection point onto BPA's existing 230 kV Allston - Clatsop transmission line at BPA pole #7102-23-1 or a new 230 kV interconnection point onto BPA's existing 230 kV system at BPA's Driscoll substation.
Generator TypeWind Turbine
Fuel SourceWind Turbine
Nameplate Mw Total117
Max Summer Mw117
Max Winter Mw117
Reason Not Completed.