BPA queue ID G0633 Terminal status
| Queue ID | G0633 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | Ashe - Marion No 2 transmission line, approximately 83 miles from Ashe Substation. |
| Point of interconnection | Ashe - Marion No 2 500 kV transmission line, approximately 83 miles from Ashe Substation. |
| County | Gilliam |
| State | OR |
| Voltage | 500 kV |
| Capacity | 500 MW |
| Resource (as published) | Wind Turbine/Wind Turbine |
| Resource category | Wind (normalised for filtering) |
| Target commercial operation | 2023-10-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | Ashe - Marion No 2 500 kV transmission line, approximately 83 miles from Ashe Substation. |
| Generator Type | Wind Turbine |
| Fuel Source | Wind Turbine |
| Nameplate Mw Total | 500 |
| Max Summer Mw | 500 |
| Max Winter Mw | 500 |
| Reason Not Completed | . |
| Comments | A hybrid project that consists of Wind, Solar and Energy Storage. |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.