Not reported
BPA queue ID G0612 Terminal status
| Queue ID | G0612 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | EE Clouse - Harvalum transmission line. |
| Point of interconnection | EE Clouse - Harvalum 230 kV transmission line. |
| County | Klickitat |
| State | WA |
| Voltage | 230 kV |
| Capacity | 75 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2021-12-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | EE Clouse - Harvalum 230 kV transmission line. |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 75 |
| Max Summer Mw | 75 |
| Max Winter Mw | 75 |
| Reason Not Completed | . |
| Comments | Request reduced to 127 MW from 202.34 MW on 4/16/19. Request reduced, via material modification analysis, from 127 MW to 75 MW on 6/30/2020. |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.