BPA queue ID G0591 Terminal status

Queue IDG0591
Project nameNot reported
Status (as published)WITHDRAWN
SubstationWheat Field Wind Power Project switchyard, bus, interfacing with BPA's Jones Canyon Substation.
Point of interconnectionWheat Field Wind Power Project switchyard, 230 kV bus, interfacing with BPA's Jones Canyon Substation.
CountyGilliam
StateOR
Voltage230 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2021-10-31
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiWheat Field Wind Power Project switchyard, 230 kV bus, interfacing with BPA's Jones Canyon Substation.
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total50
Max Summer Mw0
Max Winter Mw0
Reason Not Completed.
Comments101.88 MW Request. Modified down to 50 on 1/7/22. Combined with Wheat Field Wind Power no increase in power injected into the transmission system.