Not reported
BPA queue ID G0591 Terminal status
| Queue ID | G0591 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | Wheat Field Wind Power Project switchyard, bus, interfacing with BPA's Jones Canyon Substation. |
| Point of interconnection | Wheat Field Wind Power Project switchyard, 230 kV bus, interfacing with BPA's Jones Canyon Substation. |
| County | Gilliam |
| State | OR |
| Voltage | 230 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2021-10-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | ERIS |
| Poi | Wheat Field Wind Power Project switchyard, 230 kV bus, interfacing with BPA's Jones Canyon Substation. |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 50 |
| Max Summer Mw | 0 |
| Max Winter Mw | 0 |
| Reason Not Completed | . |
| Comments | 101.88 MW Request. Modified down to 50 on 1/7/22. Combined with Wheat Field Wind Power no increase in power injected into the transmission system. |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.