Not reported

BPA queue ID G0545 Terminal status

Queue IDG0545
Project nameNot reported
Status (as published)WITHDRAWN
SubstationMalin-Hilltop No. 1 transmission line, at Malin Substation bus.
Point of interconnectionMalin-Hilltop No. 1 230 kV transmission line, at Malin Substation 230 kV bus.
CountyKlamath
StateOR
Voltage230 kV
Capacity200 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2019-10-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS
PoiMalin-Hilltop No. 1 230 kV transmission line, at Malin Substation 230 kV bus.
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total200
Max Summer Mw200
Max Winter Mw200
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.