BPA queue ID G0542 Terminal status

Queue IDG0542
Project nameNot reported
Status (as published)WITHDRAWN
SubstationBPA's La Pine - Fort Rock Transmission Line through an interconnection on MEC's Fort Rock Substation.
Point of interconnectionBPA's La Pine - Fort Rock 115 kV Transmission Line through an interconnection on MEC's Fort Rock 115 kV Substation.
CountyLake
StateOR
Voltage115 kV
Capacity106 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2018-12-31
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS
PoiBPA's La Pine - Fort Rock 115 kV Transmission Line through an interconnection on MEC's Fort Rock 115 kV Substation.
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total106
Max Summer Mw106
Max Winter Mw106