Substation Scout

Not reported

BPA queue ID G0481 Terminal status

Queue IDG0481
Project nameNot reported
Status (as published)Decommissioned (terminated)
SubstationSnohomish PUD's distribution system (Harbour Pointe circuit 12-)
Point of interconnectionSnohomish PUD's 12 kV distribution system (Harbour Pointe circuit 12-2277)
CountySnohomish
StateWA
Voltage12 kV
Capacity2 MW
Resource (as published)Battery/Energy Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2013-08-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiSnohomish PUD's 12 kV distribution system (Harbour Pointe circuit 12-2277)
Generator TypeEnergy Storage
Fuel SourceBattery
Nameplate Mw Total2
Max Summer Mw2
Max Winter Mw2
Reason Not Completed.
CommentsGenerator Nameplate Rating: 1.5 MW

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.