Not reported
BPA queue ID G0481 Terminal status
| Queue ID | G0481 |
|---|---|
| Project name | Not reported |
| Status (as published) | Decommissioned (terminated) |
| Substation | Snohomish PUD's distribution system (Harbour Pointe circuit 12-) |
| Point of interconnection | Snohomish PUD's 12 kV distribution system (Harbour Pointe circuit 12-2277) |
| County | Snohomish |
| State | WA |
| Voltage | 12 kV |
| Capacity | 2 MW |
| Resource (as published) | Battery/Energy Storage |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2013-08-01 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | ERIS |
| Poi | Snohomish PUD's 12 kV distribution system (Harbour Pointe circuit 12-2277) |
| Generator Type | Energy Storage |
| Fuel Source | Battery |
| Nameplate Mw Total | 2 |
| Max Summer Mw | 2 |
| Max Winter Mw | 2 |
| Reason Not Completed | . |
| Comments | Generator Nameplate Rating: 1.5 MW |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.