Substation Scout

Not reported

BPA queue ID G0477 Terminal status

Queue IDG0477
Project nameNot reported
Status (as published)WITHDRAWN
SubstationBPA's Pilot Butte to LaPine transmission line, preferably via a line tap.
Point of interconnectionBPA's 230 kV Pilot Butte to LaPine transmission line, preferably via a line tap.
CountyDeschutes
StateOR
Voltage230 kV
Capacity38 MW
Resource (as published)Geothermal/Steam Turbine
Resource categoryOther (normalised for filtering)
Target commercial operation2015-12-31
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiBPA's 230 kV Pilot Butte to LaPine transmission line, preferably via a line tap.
Generator TypeSteam Turbine
Fuel SourceGeothermal
Nameplate Mw Total38
Max Summer Mw38
Max Winter Mw38
Reason Not Completed.
CommentsDraft FAS report issued 5/15/14; final FAS pending

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.