Not reported
BPA queue ID G0477 Terminal status
| Queue ID | G0477 |
|---|---|
| Project name | Not reported |
| Status (as published) | WITHDRAWN |
| Substation | BPA's Pilot Butte to LaPine transmission line, preferably via a line tap. |
| Point of interconnection | BPA's 230 kV Pilot Butte to LaPine transmission line, preferably via a line tap. |
| County | Deschutes |
| State | OR |
| Voltage | 230 kV |
| Capacity | 38 MW |
| Resource (as published) | Geothermal/Steam Turbine |
| Resource category | Other (normalised for filtering) |
| Target commercial operation | 2015-12-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | ERIS |
| Poi | BPA's 230 kV Pilot Butte to LaPine transmission line, preferably via a line tap. |
| Generator Type | Steam Turbine |
| Fuel Source | Geothermal |
| Nameplate Mw Total | 38 |
| Max Summer Mw | 38 |
| Max Winter Mw | 38 |
| Reason Not Completed | . |
| Comments | Draft FAS report issued 5/15/14; final FAS pending |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.