Substation Scout

Not reported

BPA queue ID G0442 Terminal status

Queue IDG0442
Project nameNot reported
Status (as published)WITHDRAWN
SubstationCanal to Minidoka BPA line, 6-8 miles South of Minidoka Dam
Point of interconnectionCanal to Minidoka BPA 13.8kV line, 6-8 miles South of Minidoka Dam
CountyCassia
StateID
Voltage13.8 kV
Capacity20 MW
Resource (as published)Wind Turbine/Wind Turbine
Resource categoryWind (normalised for filtering)
Target commercial operation2011-12-31
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiCanal to Minidoka BPA 13.8kV line, 6-8 miles South of Minidoka Dam
Generator TypeWind Turbine
Fuel SourceWind Turbine
Nameplate Mw Total20
Max Summer Mw20
Max Winter Mw20
Reason Not Completed.
CommentsWithdrawn 10/31/13

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.