Substation Scout

Not reported

BPA queue ID G0421 Terminal status

Queue IDG0421
Project nameNot reported
Status (as published)WITHDRAWN
SubstationBPA's Gardiner Substation via Douglas Electric Cooperative's Transmission/Distribution Facility.
Point of interconnectionBPA's Gardiner Substation via Douglas Electric Cooperative's Transmission/Distribution Facility.
CountyDouglas
StateOR
VoltageNot reported
Capacity2 MW
Resource (as published)Water/Wave
Resource categoryHydro (normalised for filtering)
Target commercial operation2012-06-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiBPA's Gardiner Substation via Douglas Electric Cooperative's Transmission/Distribution Facility.
Generator TypeWave
Fuel SourceWater
Nameplate Mw Total2
Max Summer Mw2
Max Winter Mw2
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.