Substation Scout

Not reported

BPA queue ID G0387 Terminal status

Queue IDG0387
Project nameNot reported
Status (as published)WITHDRAWN
SubstationMidstate Electric distribution system at Christmas Valley Substation
Point of interconnectionMidstate Electric 24.9kV distribution system at Christmas Valley Substation
CountyLake
StateOR
Voltage24.9 kV
Capacity10 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2009-12-31
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiMidstate Electric 24.9kV distribution system at Christmas Valley Substation
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total10
Max Summer Mw10
Max Winter Mw10
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.