Substation Scout

Not reported

BPA queue ID G0313 Terminal status

Queue IDG0313
Project nameNot reported
Status (as published)WITHDRAWN
SubstationSouth Elma Substation
Point of interconnectionSouth Elma Substation
CountyLewis
StateWA
VoltageNot reported
Capacity128 MW
Resource (as published)Wind Turbine/Wind Turbine
Resource categoryWind (normalised for filtering)
Target commercial operation2011-12-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS
PoiSouth Elma Substation
Generator TypeWind Turbine
Fuel SourceWind Turbine
Nameplate Mw Total128
Max Summer Mw128
Max Winter Mw128
Reason Not Completed.
CommentsFAS Study Issued 11/1/2010 Integration project.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.