Not reported

BPA queue ID G0278 Terminal status

Queue IDG0278
Project nameNot reported
Status (as published)WITHDRAWN
SubstationMidway-North Bonneville Line
Point of interconnectionMidway-North Bonneville 230kV Line
CountyKlickitat
StateWA
Voltage230 kV
Capacity75 MW
Resource (as published)Wind Turbine/Wind Turbine
Resource categoryWind (normalised for filtering)
Target commercial operation2009-12-01
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiMidway-North Bonneville 230kV Line
Generator TypeWind Turbine
Fuel SourceWind Turbine
Nameplate Mw Total75
Max Summer Mw75
Max Winter Mw75
Reason Not Completed.
CommentsWithdrawn by Customer on March 5, 2009.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.