0 active projects
totaling 0 MW in the APS queue, plus 2 with terminal status (shown grayed).
2 APS queue filings name Yavapai Substation as the point of interconnection, all in AZ.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
Q335
Not reported
500
360
Solar
Withdrawn
Q451
Not reported
230
250
Hybrid
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with APS before relying on these figures.